How to compare two construction schedule PDFs.

Your GC sent a new schedule as a PDF. How to find every activity that moved, was added or was removed, and what it means for your crew.

Most subcontractors get the GC's schedule as a PDF printed from Primavera P6 or Microsoft Project. Each update can run to hundreds of pages, and the changes that matter to your trade are buried in it. Nobody marks them for you.

This is the step-by-step way to compare two schedule PDFs: by hand first, then the faster way. If you want the reasons a comparison goes wrong, read why comparing two schedule revisions is hard.

Why comparing schedule PDFs is hard

  • The tools need the native file. P6's own comparison and most schedule analysis tools want the XER or MPP. Subs rarely get it.
  • The rows do not line up. Activity IDs get renumbered, names get reworded and pages shift between updates.
  • By eye takes hours. On a large job it takes most of a day, and a quietly deleted activity is the easiest thing to miss.

How to compare two schedule PDFs by hand

  1. Open last month's PDF and this month's side by side.
  2. Find each activity in your scope in both files, by ID or by name.
  3. Write down its start and finish in each, and how many days each moved.
  4. Look for activities that appear in only one of the two: those were added or removed.
  5. Check the activities just before yours. A slip upstream is the one that reaches your crew next.
  6. Repeat for every update, every month.

This works on a small job. On a 2,000-activity schedule it is a day of work each month, and the result is a list nobody else can check.

The faster way: compare the PDFs in GanttAI

  1. Upload the old schedule PDF and the new one. Prints from P6, Microsoft Project and Asta all work, and so do Excel schedules.
  2. GanttAI reads every row and checks it against the page, so nothing is dropped without you knowing.
  3. It matches activities across the two files even when IDs or names changed, and reports what was added, removed and moved, and by how much.
  4. Start with the changes in your scope, then open the whole schedule if you need it.
  5. See what the change does to your crew: people per trade per day, before and after.
  6. Download the report to Excel, or share it with your team.

Questions subs ask

Does it work with P6 and Microsoft Project PDFs? Yes. It reads PDFs printed from Primavera P6, Microsoft Project and Asta, and Excel schedules.

Do I need the native XER or MPP file? No. The PDF the GC already sends you is enough.

What if the activity IDs changed between updates? GanttAI matches activities on more than the ID, so a renumbered or reworded activity is still the same activity.

Can I try it free? Yes. The free trial is 1 project, 2 schedule reviews and 1 comparison between them, with no card.

Compare your two schedule PDFs.

Upload last month's and this month's. See every change in your scope, and what it does to your crew.